The U.S. Environmental Protection Agency (EPA) recently released a technical memo regarding the use of water and asbestos-contaminated water capture at ordered demolition sites. To that end, the EPA requested copies of project designs from multiple state-level asbestos agencies, and out of the hundreds of project designs that they received and reviewed, they selected one of SUMMIT‘s project designs from a site in South Carolina to showcase. We are honored at the opportunity to have our team’s work recognized by the EPA! (The full, 19 MB document may be downloaded at this link courtesy of the EPA – see page 39 and following for SUMMIT‘s selected design.)