SUMMIT to work with Duke Power at Cliffside Station

SUMMIT was awarded the Geotechnical Engineering and Materials Testing for the Cliffside Steam Station for Duke Power in Mooresboro, NC. SUMMIT will be working with HDR Engineering, Inc.