SUMMIT was awarded the Materials Testing and Special Inspections for the Charlotte Douglas International Airport West Terminal Expansion project. This is the 2nd largest project the airport has ever done, construction will start summer 2012 and expected completion date is 2014. SUMMIT will work with C Design Architeccural firm who has designed the 42,000 square foot expansion which will include three floors; a ramp level, ticket level and an office level.